Dismantling buildings
Dismantling involves the careful deconstruction of building components for repair, re-use, re-purposing or recycling. Dismantling differs from deconstruction in that it can be undertaken as a means of conservation, maintenance and repair works, whereas deconstruction involves taking a building down, albeit in a careful way that aims to minimise waste and maximise re-use. Dismantling also differs from demolition in that it does not generally involve the clearance of an entire structure.
Dismantling can be required on projects where it is necessary to remove intricate components, where there is a safety risk (for example if a structure contains asbestos or other hazardous materials), where it is necessary to move a component from one place to another, or where the structure and/or surrounding environment is particularly sensitive.
The cost and time required for dismantling depends on factors such as; complexity, volume, site conditions, building type, time availability, materials and techniques used, available records and so on.
According to the Construction (Design and Management) Regulations (CDM Regulations), all dismantling work should be carefully planned and carried out by competent professionals to avoid unplanned structural collapse.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Minimum energy efficiency standards (MEES)
CIAT briefing on response to consultations for privately rented non-domestic properties.
Connect, collaborate, shape the future
Registration now live for UK Construction Week Birmingham.
CIOB announces Saul Humphrey FCIOB as new President for 26/27 term.
A quick, simple, and zero-bills solution to prevent overheating.
The adaptive reuse of large industrial structures.
Promoting the circular economy by extending the life of buildings.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.

















